INDUSTRIAL SERVICES · EUROPE+31 623 62 54 35vr@industrycore.nl
Get a quotation
← Back

INDUSTRY CORE / Expertise

Data centre installation packages

Coordinated mechanical and electrical installation for data centre construction. Our teams deliver piping, ventilation, cable infrastructure, equipment supports and insulation as defined work packages.

Connected installation scopes

  • Cooling-water and utility piping, valves, supports and prefabricated pipe assemblies.
  • Round and rectangular ventilation ductwork, workshop prefabrication and site installation.
  • Cable trays and ladders, cable pulling, electrical connections and BMS field installation.
  • Steel supports, technical insulation and metal cladding, coordinated with the installation sequence.
  • Drawing review, work-package boundaries, testing responsibilities and handover requirements agreed with the project team.
Get a team quotation ↗
Image by Homa Appliances

A clear scope. A price that fits.

We prepare estimates from drawings, specifications and quantities. Choose a project price for a defined scope or unit rates for measurable work.

Project price: an agreed package with scope, exclusions, schedule and acceptance criteria.

Unit rates: per metre of pipe or cable, square metre of ductwork, insulation or formwork, tonne of steel or reinforcement, or installed item, as agreed.

Send drawings, quantities, materials, location and programme. We clarify supply, access, lifting, testing and changes before confirming the quotation.

Qualified people. Safety on site.

For work in the Netherlands and Belgium, all our workers hold B-VCA; foremen and operational managers hold VOL-VCA, and personnel coordinators hold VIL-VCU.

For Finnish projects, our teams include holders of the Occupational Safety Card (Työturvallisuuskortti) and Hot Work Card (Tulityökortti).

Task-specific qualifications, site induction, permits and safe working arrangements are matched to the assignment before mobilisation.

Tell us about your project

  • Project location and planned start date
  • Required trades, scope and available drawings
  • Expected duration and site-specific requirements
vr@industrycore.nl ↗

INDUSTRY CORE / TEAM

Request a team quotation

Tell us what you need. We will prepare a quotation for your project.

Certified specialists. Accommodation and transport available on request.

Your contact details will only be used to respond to this request. Privacy

INDUSTRY CORE / CONTACT

Let’s build your next project.

vr@industrycore.nl ↗Call our team: +31 623 62 54 35 ↗