We prepare estimates from drawings, specifications and quantities. Choose a project price for a defined scope or unit rates for measurable work.
Project price: an agreed package with scope, exclusions, schedule and acceptance criteria.
Unit rates: per metre of pipe or cable, square metre of ductwork, insulation or formwork, tonne of steel or reinforcement, or installed item, as agreed.
Send drawings, quantities, materials, location and programme. We clarify supply, access, lifting, testing and changes before confirming the quotation.
Qualified people. Safety on site.
For work in the Netherlands and Belgium, all our workers hold B-VCA; foremen and operational managers hold VOL-VCA, and personnel coordinators hold VIL-VCU.
For Finnish projects, our teams include holders of the Occupational Safety Card (Työturvallisuuskortti) and Hot Work Card (Tulityökortti).
Task-specific qualifications, site induction, permits and safe working arrangements are matched to the assignment before mobilisation.
02 / PROJECT EXPERIENCE
Built on real experience.
43 / Projects
01
Piping & storage tanks — Shell Europoort
At Shell Europoort in the Netherlands, our team supported piping installation and industrial storage tank construction. The scope brought together assembly, fit-up, welding and mechanical support within the same on-site work package.
Approx. 8 specialistsEuropoort, Netherlands
02
High-rise sprinkler installation
In Den Haag, our team carried out sprinkler installation works in a high-rise building. The project focused on the building’s fire-protection pipework, with a dedicated installation team assigned to this specialist scope.
Approx. 10 specialistsDen Haag, Netherlands
03
Storage tank construction — BP Europoort
At the BP Europoort petrochemical refinery, our team participated in the construction of industrial storage tanks. This assignment formed part of the refinery’s tank infrastructure works and focused on on-site construction activities.
Approx. 10 specialistsEuropoort, Netherlands
04
Fire-protection sprinkler systems
In Antwerp, our team installed sprinkler systems as part of the project’s fire-protection infrastructure. The assignment was centred on sprinkler installation, supported by a dedicated group of specialists on site.
Approx. 12 specialistsAntwerp, Belgium
05
Brewery control-box installation
For a beer production line in Belgium, our team carried out control-box installation works. The assignment focused on the electrical control equipment serving the production line.
Approx. 10 specialistsBelgium
06
Electrical installation — Costa & Carnival
On the Costa 2 and Carnival 2 projects in Turku, our electrical team worked across the installation sequence, from cable pulling to final connections and testing. The scope covered multiple stages of the vessels’ electrical fit-out.
Approx. 8 specialistsTurku, Finland
07
Boiler & pipework insulation
In Frankfurt, our insulation team worked on two boilers, their associated pipework and equipment. The documented scope covered approximately 15,000 m², bringing several insulation work areas together within one project.
Approx. 15 specialistsFrankfurt, Germany
08
Façade, walls & window installation
At Kärnekulla in Habo, our team carried out façade works, internal wall installation and window installation. The assignment combined exterior building-envelope work with interior construction activities.
Approx. 12 specialistsHabo, Sweden
09
Office plumbing — Keilaniemi Tower
At Keilaniemi Office Tower in Helsinki, our team installed plumbing systems across three office floors. The project focused on plumbing installation within a multi-floor office environment.
Approx. 5 specialistsHelsinki, Finland
10
Tank cladding & CUI works — BP Rotterdam
At BP Refinery Rotterdam, our team worked on corrosion-under-insulation projects and the installation of sheet-metal envelopes on tanks. The scope focused on the external protective covering of industrial tank infrastructure.
Approx. 15 specialistsRotterdam, Netherlands
11
Turnaround insulation — Shell Moerdijk
At Shell Moerdijk, our team carried out insulation and sheeting works during a turnaround. Standby personnel were also provided throughout the shutdown period to support the site’s insulation work requirements.
Approx. 5 specialistsMoerdijk, Netherlands
12
Piping assembly & welding — Citrybel
For the Citrybel project in Tienen, our team assembled and welded piping systems. The work package included pipe installation, fit-up, welding and mechanical support on site.
Approx. 12 specialistsTienen, Belgium
13
Electrical installation
In Rostock, our team provided electrical installation support. A dedicated electrical work package formed the core of this assignment, delivered by an on-site specialist team.
Approx. 15 specialistsRostock, Germany
14
HVAC & piping — FRA33 data centre
On the FRA33 data centre construction project in Frankfurt, our team carried out HVAC and piping works. The assignment combined ventilation and pipe-system installation within the data centre’s technical infrastructure.
Approx. 15 specialistsFrankfurt, Germany
15
EV charging station installation
Across multiple locations, our teams worked on the installation of electric vehicle charging stations. The assignment supported the rollout of charging infrastructure through site-based installation work.
Approx. 10 specialistsMultiple locations
16
Power-converter installation & testing
For a power-converter project in Sweden, our team installed equipment, completed connections and carried out testing. The scope also included connections to the control box.
Approx. 12 specialistsSweden
17
Turnkey industrial piping
For an industrial building in Copenhagen, our team delivered a turnkey piping supply and installation package. The assignment covered the complete pipe-system installation rather than an isolated section of work.
Approx. 5 specialistsCopenhagen, Denmark
18
Boiler, tank & pipeline insulation
In Husum, our team insulated a boiler, pipework, equipment and tanks. The project included more than 10 kilometres of pipes, combining several types of industrial insulation work.
Approx. 15 specialistsHusum, Sweden
19
Pipe insulation & cladding — Neste Porvoo
At the Neste Porvoo refinery, our team carried out insulation and cladding on pipe systems. The work covered both the insulating layer and the outer protective covering of the pipework.
Approx. 12 specialistsPorvoo, Finland
20
School plumbing, HVAC & interiors
At Otaniemi School in Espoo, our team carried out plumbing, HVAC and interior works. The assignment brought building-services installation and interior construction activities into one project scope.
Approx. 5 specialistsEspoo, Finland
21
Insulation & sheeting — Neste Naantali
At the Neste plant in Naantali, our team dismantled old sheeting, carried out insulation work and fabricated replacement sheeting locally. The documented scope covered 3,167 m² and included installation of the new protective covering.
Approx. 8 specialistsNaantali, Finland
22
Tank insulation — Koole Tankstorage
At Koole Tankstorage in Rotterdam, our team completed tank insulation and fitted flat and trapezoidal sheeting. The assignment covered both insulation and the external sheet-metal finish.
Approx. 5 specialistsRotterdam, Netherlands
23
Storage tank construction — Koole Terminal
At Koole Terminal in Europoort, our team carried out industrial storage tank construction works. This project added to our portfolio of on-site tank infrastructure assignments in the Rotterdam area.
Approx. 10 specialistsEuropoort, Netherlands
24
Ventilation prefabrication & installation
For a data centre project in Milan, ventilation components were prefabricated in our Rotterdam workshop and installed in Italy. The assignment linked workshop production with installation at the destination site.
Approx. 15 specialistsMilan, Italy
25
HVAC installation — CPH3 data centre
On the CPH3 data centre construction project in Copenhagen, our team carried out HVAC works. The assignment focused on the building’s heating, ventilation and air-conditioning installation scope.
Approx. 10 specialistsCopenhagen, Denmark
26
Residential rooftop solar installation
In Akmene, our team installed rooftop solar panels on a residential building. The work focused on the roof-mounted solar installation within the building’s energy infrastructure.
Approx. 12 specialistsAkmenė, Lithuania
27
Turnkey data centre HVAC — Copenhagen
For a data centre in Copenhagen, our team delivered a complete HVAC system installation package. The assignment covered the installation scope as a turnkey project.
Approx. 8 specialistsCopenhagen, Denmark
28
Turnkey data centre HVAC — Antwerp
For a data centre in Antwerp, our team delivered a complete HVAC system installation package. The project focused on the data centre’s heating, ventilation and air-conditioning infrastructure.
Approx. 12 specialistsAntwerp, Belgium
29
Transfer & tank-connection pipelines
In Brake, our team worked on transfer pipelines and tank-connection pipework. The documented scope included more than three kilometres of piping serving the tank infrastructure.
Approx. 5 specialistsBrake, Germany
30
Shipyard welding & insulation — MV Werften
At MV Werften in Wismar, our team carried out welding and insulation works. The assignment combined metalworking and insulation activities within a shipyard project.
Approx. 8 specialistsWismar, Germany
31
Vessel electrical & interior works
At Meyer Turku shipyard, our team carried out electrical installation and interior works on the Costa 1 and Carnival 2 vessels. The project combined technical installation with interior fit-out activities.
Approx. 5 specialistsTurku, Finland
32
Insulation & cladding — BASF Antwerp
At the BASF chemical plant in Antwerp, our team carried out insulation, local prefabrication and sheeting installation. The scope connected on-site fabrication with the application of protective sheet-metal coverings.
Approx. 5 specialistsAntwerp, Belgium
33
HVAC & insulation — Symphony of the Seas
At Chantiers de l’Atlantique in Saint-Nazaire, our team worked on Symphony of the Seas. The assignment included insulation, cladding and HVAC works within the vessel’s construction programme.
Approx. 15 specialistsSaint-Nazaire, France
34
Electrical installation — ICON 3
On ICON 3 at Meyer Turku, our team installed cable trays, laid cables and connected electrical equipment and control panels. The scope also included testing and commissioning activities.
Approx. 5 specialistsTurku, Finland
35
Piping installation — BRU4 data centre
On the BRU4 data centre construction project in Brussels, our team carried out piping works. The assignment focused on pipe-system installation within the facility’s technical infrastructure.
Approx. 10 specialistsBrussels, Belgium
36
Electrical & piping — AMS GS data centre
On the AMS GS data centre project in Amsterdam, our team carried out electrical and piping works. The assignment combined two technical disciplines within the same construction project.
Approx. 10 specialistsAmsterdam, Netherlands
37
Factory cabling & control equipment
At a furniture factory, our team carried out cabling, equipment connections and control-box installation. The work connected production equipment with its electrical and control infrastructure.
Approx. 8 specialistsLocation not specified
38
Rooftop solar structures & installation
For a rooftop solar project in the Netherlands, our team assembled secondary support structures, installed panels and completed assembly and connection works. The scope covered both the supporting construction and the solar installation.
Approx. 8 specialistsNetherlands
39
Reinforcement, formwork & concrete floors
In Mölndal, our team carried out floor reinforcement, formwork and concrete works. The documented scope included tying reinforcement, concreting floor-slab joints, A1-class floor concreting and concrete surface finishing.
Approx. 8 specialistsMölndal, Sweden
40
Foundation & concrete works
In Njarðvík, our team carried out foundation formwork, reinforcement and concreting. The scope also included backfilling, preparation for service lines and floor concreting, followed by formwork dismantling and cleaning.
Approx. 8 specialistsNjarðvík, Iceland
41
Bridge welding
In Olskroken, our team carried out bridge welding works. The assignment focused on welding within an infrastructure construction project, supported by a dedicated specialist crew.
Approx. 12 specialistsOlskroken, Sweden
42
Biodiesel plant insulation & cladding
At a biodiesel plant in Motherwell, our team insulated pipelines and tanks using materials including mineral wool and fibreglass. Cladding was then installed over the insulation as part of the same work package.
Approx. 15 specialistsMotherwell, Scotland
43
Turnaround insulation — ExxonMobil
At ExxonMobil Rotterdam, our team carried out insulation and sheeting works during a turnaround. Standby personnel were provided throughout the shutdown period to support the site’s insulation requirements.
Approx. 15 specialistsRotterdam, Netherlands
03 / COMPANY
Industrial expertise.
People who make it happen.
Industry Core brings together skilled teams, workshop fabrication and on-site project support. Based in the Netherlands, we work across Europe on industrial construction, technical installations and maintenance projects.
Electrical, mechanical, piping, HVAC, steel fabrication, insulation and scaffolding expertise for defined project work packages.
Workforce coordination
Recruitment, project documentation, accommodation and on-site coordination — organised around the people and scope your project needs.
Workshop capability
Prefabrication of secondary steel, heavy ventilation ducts and piping systems in our 1,335 m² workshop in De Lier, near Rotterdam.
Experience across demanding environments
Data centres
Petrochemical facilities
Shipbuilding
Industrial & civil infrastructure
Solar installations
04 / Compliance
Certification for our projects. Documentation you can trust.
We support our industrial projects with certificates, registrations and country-specific documentation. From safety certification to tax records and occupational healthcare, we provide the relevant documents for the agreed work and project location. Request a documentation package tailored to your project.
Certificates & insurance
Certificate
🇪🇺 EU
VCA* 2017/6.0
EBN.VCA.4885 · EBN Certification B.V. Pipe fitting, welding and insulation in the Netherlands and Belgium.
Liability insurance policy, subject to insured activities, terms and exclusions.
From 2025-09-29
Archive record
🇪🇺 EU
BTA · LT22-BCAD-00001859-4
Historical liability insurance policy; the supplied cover period has ended.
From 2022-10-11
Registrations & supporting documents 19 +
Dated record · recheck
🇳🇱 NL
SNA
Two SNA registration declarations. The file named NEN is an SNA declaration, not a separate NEN certificate. Validity depends on the current SNA register.
Bank and G-account records, posted-worker paperwork, Belgian advisory mandate and VCA/VCU audit report. Supporting records, not additional certificates.
From 2024–2025
Application / supporting record
🇩🇪 DE
Germany · Employment documentation
Employer minimum-wage declaration dated 2 July 2024 and a supplied 2024 administrative spreadsheet. Historical supporting material, not independent certification.
From 2024
Application / supporting record
🇪🇺 EU
Financial background
Historical group turnover summary supplied for commercial background. It is not an audited certificate or an executed cross-company guarantee.
From 2023
Dated record · recheck
🇳🇱 NL
G Account
Dutch G-account documentation for project administration.
From 2024
Application / supporting record
🇧🇪 BE
Limosa
Belgian posted-worker notification documentation requested for each applicable assignment. The supplied Belgian mandate supports administration; a project-specific Limosa-1 receipt must be confirmed.
—
Dated record · recheck
🇫🇮 FI
YTJ · Business registration
Finnish Business ID registration. YTJ extract dated 12 August 2025; company-directory screenshot also supplied.
From 2019-09-25
Dated record · recheck
🇫🇮 FI
YTJ · Prepayment register
Prepayment register entry shown in the supplied YTJ extract of 12 August 2025.
From 2025-08-08
Archive record
🇫🇮 FI
Vero · Certificate of paid taxes
Historical Finnish Tax Administration certificate confirming the tax position at issue.
From 2020-01-09
Dated record · recheck
🇫🇮 FI
Occupational healthcare
Preventive occupational healthcare agreement, including support for work ability and workplace health planning.
From 2025-09-09
Application / supporting record
🇫🇮 FI
Reliable Partner · Authorisation
Power-of-attorney agreement for the Reliable Partner service. A current compliance report is required to confirm programme status.
From 2024-12-04
Dated record · recheck
🇪🇺 EU
VIES · VAT verification
EU VAT-number validation result supplied with the Finnish project documents. It records the result on the check date.
From 2025-05-13
From indicates the start or issue date of the supplied record, not continuous validity. Archive records are historical. Current documents and project applicability are confirmed on request.
At Industry Core, we operate a state-of-the-art fabrication facility with the following capabilities:
• 🏭 Total Area: 1,335 sq. meters of cutting-edge fabrication space.
• 🚪 Access: 2 wide entrances (5m width, 4.5m height) for seamless material handling.
• 🚛 Heavy Lifting: Equipped with 2 portal cranes (3.2 tons each).
• 🏋️ Floor Load Capacity: Supports up to 3,000 kg per 1m².
• 🌐 Outdoor Storage: 500m² for additional storage needs.
• ⏱️ Operational Capacity: Up to 700 working hours per week in a single shift.
• 🌬️ Modern Systems: Advanced HVAC and natural lighting for optimal working conditions.
Capabilities
Our workshop specializes in fabricating:
• Secondary Steel Structures
• Heavy Ventilation Ducts
• Piping Systems
We work with both stainless steel and carbon steel, ensuring durability and precision in every project.
Welding Expertise
Our certified welding procedures include:
• 111, 141, 135, 136, 138 – performed across all positions for unparalleled flexibility and quality.
Location
📍 Conveniently located in De Lier, within the Rotterdam area, for easy access to key industrial hubs.